Description
The XDP Remanufactured 7.3L AE Fuel Injector XD475 will replace the failed injector in your 1999.5-2003 Ford 7.3L Power Stroke(#8 Long Lead). With over 30 million injectors on the road and years of product design & manufacturing experience, you can be sure you are getting a quality product.
Each injector surpasses the engine manufacturers most current design specifications. This result in fuel injectors injectors that have less than 0.2% warranty rate. Once completely remanufactured, each fuel injector is tested for injection timing measurements, poppet seat leakage test, and shot-to-shot flow meters for best-in-class testing. Other tests include tests for leakage and opening operation as well as nozzle flow and needle lift.
Quality & Testing
- Advanced end-of-line testing, delivery, leakage and opening characteristics.
- Precision remanufacturing process ensures highest quality, reliability and performance.
- Opening clearances are set to exacting specifications; validated with engine & vehicle testing and compared to OE product.
FEATURES:
- Stock HP & Flow Rating
- Best In Class End-Of-Line Testing
- Nozzles Tested For Flow, Leakage & Needle Lift
- In-Line Error Proofing Incorporated In Assembly Process





Reviews
There are no reviews yet.